Haslington
Methodist Church
Haslington
  • Client: Cheshire South Methodist Circuit
  • Contract duration: 14 Weeks (JCT Minor works 2011)

Double storey extension to Haslington Methodist Church, comprising of entrance hall, storage room and Sacristy.

Scope of works

  • Internal passenger lift by RJ lifts.
  • Disabled access ramp with handrails and tarmacadam finishes to the car park.
  • Bespoke hardwood windows and fully automated entrance door.
  • Meticulous matching of facing bricks and timber windows to ensure the extension was sympathetic to the existing building.