  • Client: Mr & Mrs McLeish
  • Contract duration: 26 Weeks (JCT Minor works 2011)

This project was won through a tender process for a local architect & firm of surveyors who had worked with Hough Construction on a previous project.

We worked closely on all finish specifications with an interior designer who was commissioned by the client.

Scope of works

  • Removal of the roof over the existing double garage and kitchen.
  • Construction of large master bedroom, dressing room and en-suite bathroom extension with vaulted ceiling and feature hardwood windows.
  • Creation a further two bedrooms and en-suite bathroom within the existing loft space of the property which included electric roof windows.
  • Solar panels were installed on the roof.
  • Remodelling of the first floor was carried out to optimise the space.
  • Creating a large open plan stairwell to accommodate a bespoke oak feature staircase spanning three floors including glass balustrading.

Specialist design features

  • Flooring by Ted Todd.
  • Designer feature lighting by Bocci.
  • Natural stone finishes to the bathrooms by Mandarin Stone.
  • High specification designer sanitary ware by Geberit.
  • Hulsta fitted bedroom furniture.
  • Sliding wardrobes by Sliderobes.
  • Oak internal doors with satin nickel Architectural ironmongery.